641-1,110 1,175.0
28
21 0 0 7 28 8 0-04 0-30 0-14 0-56 1-08 1-12 1-29 1-02 0-36 0-36 0-44 0-54 6-38 0-11 2-27 2-27 2-51 3-18 2-35
All 185-1,110 2,315.0
28
22 0 0.1 5 27 12 0-07 1-20 0[V] 1-48 2-01 2-11 2-17 1-56
[W]
0-10 3-18 3-31 3-41 3-47 3-26
25-1,110 2,715.0
26
21 0.1 0.1 3 24 17.1 0-12 3-13 [V]
2-05 [W]
0-09
5-27
СВОДКА
Weight of iron Section between rings Description Average No. of Men in Gang Average No. of cubic yards per ring Time mucking, per cubic yard Average Time per Ring. Unavoidable Delays (not Included in Average Time per Ring).
Length in feet Material Ave. air Pressure Method of Excavation Shield Drilling Grouting Air trans Total Shoving and mucking [V] Erection [W] Lost time Total Items Time hrs min
Ordinary 1-24 60.0 Rock 0 [X] 9 .04 0 0 10 46 0-06 4-32 6-23 0-00 10-55 First bulkhead 132-00
25-55 77.5 " 20 [X] 14 5 0.5 1 21 46 0-51 39-33 4-29 0-00 44-02 Second bulkhead 158-50
56-72 42.5 Mixed sand and rock 10 [X]Breasting 22 2 .09 2 26 44 0-21 15-05 2-55 0-04 18-04 Grouting 240-00
73-165 232.5 Sand & gravel 10 [X]Breasting 22 0 .1 2 24 39 0-11 6-56 2-26 0-09 9-31 Old cave-in 234-00
166-184 47.5 Sand and silt with piles 20 [X]Breasting and cutting piles 22 0 .38 3 25 42 0-09 6-19 2-37 0-07 9-03 Shoving tube 128-00
185-253 172.5 Silt w/ piles 24 [X]Breasting and cutting piles 23 0 .71 3 26 43 0-09 6-13 2-15 0-05 8-43 - -
254-640 110.0 Silt 26 [Y]Doors 22 0 0 3 25 11 0-07 1-13 2-20 0-08 3-41 Total 892-50
25-640 1,540.0
20 [Y]Doors 21 0.3 .12 3 24 24 0-14 5-06 2-24 0-08 7-38 per ring 0-49
Hvy 641-1,110 1,175.0
28
21 0 0 7 28 8 0-04 0-44 1-40 0-11 2-35
All 25-1,110 2,715.0
26
21 0.1 0.1 3 24 17.1 0-12 3-13 3-05 0-09 5-27
[V] Включая время работы домкратов.
[W] Включая время затяжки болтов.
[X] Разработка грунта впереди щита.
[Y] Продвижение щита в ил при открытых... дверях.
ТАБЛИЦА 27. — Работы по щитовой проходке тоннеля, Уихокенская шахта, южный русловой тоннель. Таблица, показывающая размер бригады, объем выемки породы и время на одно кольцо, затрачиваемое на различные операции при сооружении тоннеля в различных типах встреченных грунтов; а также масштабы и характер всех непредвиденных задержек.
Weight of iron. Section between rings. Description. Ave. No. of Men in Gang. Av. No. of cu. yd. per ring. Time Mucking, per cu. yd. Av. Time per ring Shoving and Mucking. Time for Jacks. Time for Ring Erection, Hrs. and Min. Bolting Time, (Whole Time on Bolts After Ring is Complete.) Time lost repairing hydraulic piping. Total Time.
Length in feet. Material. Ave. air Pressure. Method of Excavation. Shield. Drilling. Grouting. Air trans. Total. Straight. Bore 1. Bore 2. Taper. Mean. Straight. Bore 1. Bore 2. Taper. Mean. Straight. Bore 1. Bore 2. Taper. Mean.
A B C D E F G G G G G H H H H H
Ordinary. 1-27 67.5 Rock 9
[B] Excavation partially completed previously.
8-30
3-45 8-08 Bolting time for light iron is included in erection. 0-14 21-11
16-26 20-49
28-42 37.5 " 12 [B] 13 4 1 1 19 48.7 0-25 20-33
4-23
4-00 4-21 0-12 25-08
24-45 25-06
43-58 40.0 Rock or gravel 12 [B] 19 2 2 2 25 44.2 0-46 33-44
4-16
5-45 4-44 1-15 39-15
40-44 39-43
59-153 237.5 Gravel and sand 16 [B]Breasting 25
1 4 30 39.0 0-12 8-06
2-19
4-18 2-23 0-30 10-55
12-54 10-59
154-170 42.5 Sand and silt with piles 18 " 26
1 5 32 41.6 0-10 7-10
2-00 J. J. 1-48 1-59 0-00 9-10 J. J. 8-58 9-09
171-236 165.0 Silt with piles 22 Top half 22
1 3 26 42.6 0-10 7-23
2-36 2-55 2-58 1-24 2-35 0-05 10-04 10-23 10-26 8-52 10-03
237-259 57.5 Silt 25
[C]1 door 18
1 3 22 13.8 0-11 2-29
3-01 2-05 1-28 2-00 2-32 0-20 5-50 4-54 4-17 4-49 5-21
260-302 107.5 " 27 [C]1 door 15
2 17 0
0-32
2-34 2-35 3-38 4-28 3-05 0-08 3-14 3-15 4-18 5-08 3-45
303-350 120.0 " 27 [C]8 doors 15
4 19 6.9 0-07 0-52
2-59 2-28 2-37 1-44 2-41 0-07 3-58 3-27 3-36 2-43 3-40
351-378 70.0 " 27.5 [C]8 " 18
6 24 0
0-33
2-05 2-32 2-48 2-00 2-18 0-17 2-55 3-22 3-38 2-50 3-08
379-424 115.0 " 27.5 [C]8 " 19
4 23 6.9 0-07 0-48
3-34 2-51 3-18 3-19 3-22 0-25 4-47 4-09 4-31 4-32 4-35
425-522 245.0 " 28 [C]1 door 19
4 23 6.7 0-06 0-45
3-09 3-51 3-00 3-28 3-16 0-16 4-10 4-52 4-01 4-29 4-17
523-625 257.5 " 28 [C]1 " 20
4 24 0
0-32
1-36 1-37 1-47 1-51 1-39 0-12 2-20 2-21 2-31 2-35 2-23
171-625 1,137.5
27
19
4 23 9.7 0-11 1-44
[Z] 2-37 2-41 2-41 2-32 2-38 0-13 4-34 4-38 4-38 4-29 4-35
28-625 1,495.0
25
19 .8 0.8 3.4 24 17.8 0-14 4-14 [Z]
2-41 0-16
7-11
Heavy. 626-649 57.5 Silt 28 [C]1 door 16
3 19 12.2 0-12 2-23 [Z] 2-19 2-30 2-05 1-42 2-16 1-01 1-04 1-04 0-50 1-01 0-32 6-15 6-29 6-04 5-27 6-12
650-733 210.0 " 28 [C]8 doors 19
4 23 13.5
0-57 0-13 1-42 1-24 1-47 1-48 1-39 1-15 0-52 0-55 0-42 1-07 0-32 4-39 3-58 4-24 4-12 4-28
734-753 50.0 " 28 [C]8 " 24
5 29 8.3 0-05 0-41 0-17 1-06 1-55 0-38 1-20 1-12 0-38 0-44 1-13 0-20 0-44 0-06 2-48 3-43 2-55 2-44 3-00
754-844 227.5 " 28 [C]8 " 26
8 34 12.8 0-04 0-51 0-16 1-19 1-41 1-52 0-50 1-29 0-39 0-50 0-54 0-40 0-44 0-25 3-30 4-08 4-18 3-02 3-45
845-859 37.5 " 28 [C]8 " 27
9 36 5.6 0-07 0-39 0-19 1-24 1-08 1-10
1-20 0-45 0-15 0-15
0-37 0-48 3-55 3-09 3-11
3-43
860-899 100.0 " 28 [C]8 " 24
8 33 16.5 0-02 0-39 0-13 1-00 1-05 1-13
1-04 0-59 0-32 0-49
0-52 0-07 2-58 2-36 3-01
2-55
900-935 90.0 " 28 [C]1 door 25
7 32 11.5 0-03 0-29 0-14 0-47 1-13 0-52 1-10 0-52 0-39 0-43 0-32 0-20 0-38 0-04 2-18 2-43 2-11 2-17 2-17
936-963 70.5 " 28 [C]1 " 25
8 33 5.9 0-03 0-19 0-15 0-59 0-47 0-55
0-56 0-34 0-16 0-41
0-32 0-37 2-44 2-14 2-47
2-39
964-1,003 100.0 " 28 [C]1 " 25
10 35 8.1 0-03 0-27 0-10 0-51 0-52 1-05
0-53 0-32 0-45 0-37
0-35 0-16 2-16 2-30 2-35
2-21
1,004-1,060 142.5 " 28 [C]1 " 26
10 36 8.7 0-03 0-30 0-15 1-01 1-09 1-05 0-45 1-03 0-54 0-37 0-49 0-40 0-49 0-24 3-04 2-55 3-03 2-34 3-01
1,061-1,110 125.0 " 28 [C]1 " 37
10 47 6.2 0-03 0-19 0-10 0-42 0-49 0-54 0-45 0-45 0-24 0-26 0-39 0-25 0-27 0-00 1-35 1-44 2-02 1-39 1-41
1,111-1,238 320.0 " 28 [C]1 " 30
9 39 15.6 0-02 0-38 0-16 0-48 1-06 1-04 1-23 0-56 0-36 0-34 0-57 1-12 0-41 0-02 2-20 2-36 2-57 3-31 2-33
1,239-1,312 185.0 " 28
39
9 38 13.0 0-03 0-36 0-18 1-04 1-01 1-02 1-15 1-07 0-39 0-43 1-12 0-59 0-50 0-10 2-47 2-48 3-18 3-18 3-01
626-1,312 1,717.5 " 28
35
8 33 10.6 0-04 0-42 0-14 1-06 1-15 1-16 1-18 1-10 0-45 0-40 0-52 0-54 0-47 0-16 3-03 3-07 3-20 3-24 3-09
All 171-1,312 2,855.0
28
23
6 29 10.2 0-07 1-15
[Z] 2-09 2-13 2-21 2-20 2-13
[A]
0-15 3-39 3-43 3-51 3-50 3-43
28-1,312 3,212.5
26
21
5 26 14.1 0-10 2-28 [Z]
2-18 [A]
0-15
5-01
СВОДКА
Weight of iron. Section between rings. Description. Ave. No. of Men in Gang. Average No. of cubic yards per ring. Time mucking, per cubic yard. Average Time per Ring. Unavoidable Delays (not Included in Average Time per Ring).
Length in feet. Material. Ave. air Pressure. Method of Excavation. Shield. Drilling. Grouting. Air Trans. Total. Shoving and mucking. [Z] Erection.[A] Lost time. Total. Items. Time, hrs. min.
Ordinary. 28-42 37.5 Rock 12 [B]Breast 13 4 1 1 19 48.7 0-25 20-33 4-21 0-12 25-06 First bulkhead 80-00
43-58 40.0 Rock and gravel 12 " 19 2 2 2 25 44.2 0-46 33-44 4-44 1-15 39-43 Second bulkhead 156-00
59-153 237.5 Gravel and sand 16 " 25
1 4 30 39.0 0-12 8-06 2-23 0-30 10-59 Grouting rock sections 280-00
154-170 42.5 Sand or silt, with piles 18 " 26
1 5 32 41.6 0-10 7-10 1-59 0-0 9-09 Blow-outs 222-00
171-236 165.0 Silt with piles 22 " 22
1 3 26 42.6 0-10 7-23 2-35 0-05 10-03 Shield repairs 326-40
237-259 57.5 Silt 25 [C]1 door 18
1 3 22 13.8 0-11 2-29 2-32 0-20 5-21 Horz. timbers 69-30
260-625 915.0 " 27 1 " 18
4 22 3.6 0-06 0-40 2-39 0-14 3-33 Total 1,134-10
28-625 1,495.0
25
19 .8 0.8 3.4 24 17.8 0-14 4-14 2-41 0-16 7-11 Per ring 0-53
Heavy. 626-1,312 1,717.5 Silt 28
25
8 33 10.6 0-4 0-56 1-57 0-16 3-09
All. 28-1,312 3,212.5
26
21
5 26 14.1 0-10 2-28 2-18 0-15 5-01
[Z] Включая время работы домкратов.
[A] Включая время затяжки болтов.
[B] Разработка грунта впереди щита.
[C] Продвижение щита в ил при открытых... дверях.
Среднее время, затрачиваемое на каждую операцию на всех забоях, приведено в таблице 28. Работа подразделяется по различным типам встреченных грунтов.
Проходка, отраженная в объеме работ, выполняемых ежемесячно каждым щитом, приведена в таблице 29.
ТАБЛИЦА 28. — Работы по щитовой проходке тоннеля. — Общее количество смонтированных колец и отработанных смен всеми четырьмя щитами по контрактам Gy-West и Gj, а также средний размер бригады, объем выемки породы и время, затрачиваемое на одно кольцо для различных операций, связанных с сооружением тоннеля в каждом из нескольких встреченных типов грунтов; а также масштабы и характер всех непредвиденных задержек.
Weight of iron. Description of Material. Total No. of rings. Total No. of feet. Total number of 8-hour shifts. Average air pressure. Ave. No. of Men in Gang. Cu. yd. per ring. Time per cu. yd. Average Time per Ring. Ave. Unavoidable Delay per Working Face.
Shield. Drilling. Grouting. Air trans. Total. Shoving and mucking. Erecting. Lost time. Total. Items not included in previous figures. Time.
Unit. Unit. Hrs. Min. Hrs. Min. Hrs. Min. Hrs. Min. Ave. unit.
Unit. Unit. Unit. Unit. Unit. K L M Hrs. Min.
Ordinary Rock. 165 412.5 597 16 18 9 0.25 1 28 51 0-27 25 15 3 41 0 02 28 58 1st Bulkhead 136 00
Rock and earth and rock and gravel. 177 442.5 500 14 22 5 0.3 2 30 45 0-26 19 31 2 55 0 11 22 37 2d " 147 54
Sand and gravel (unobstructed), NJ 188 470.0 241 13 24
0.6 3 27 39 0-12 7 31 2 24 0 20 10 15 Grouting 246 00
Sand and silt (with piles.) 171 427.5 199 22 23
1.0 3 27 43 0-09 6 46 2 24 0 09 9 19 Blow-outs 91 11
Silt under R. R. tracks, NY 396 990.0 355 19 27
3 30 42 0-06 4 09 2 51 0 10 7 10 Miscellaneous 230 33
Rip-rap and silt under bulkhead. 77 192.5 193 23 26
4 30 43 0-21 14 47 3 41 1 34 20 02 Total 851 38
Total mixed and difficult ground. 1,174 2,935.0 2,085 17 22 4 0.3 3 29 43 0-18 11 02 2 54 0 16 14 12
Silt--ordinary iron 1,302 3,255.0 676 25 22
4 26 12 0-07 1 20 2 35 0 14 4 12
Heavy Silt--heavy iron. 2,209 5,522.5 791 26 25
8 33 12 0-05 0 58 1 44 0 10 2 52
Silt--ord and heavy iron under river. 3,511 8,777.5 1,467 26 24
6 30 12 0-06 1 09 2 05 0 12 3 26
Grand total. 4,685 11,712.5 3,552 21 23 2 0.2 4 29 20 0-11 3 33 2 15 0 13 6 01
Средняя задержка на одно кольцо — 0 час. 44 мин. Среднее количество колец, построенных одним щитом = 1 146¼.
Average time per ring. 6 hr 01 min
Delays. 44 min
—————
Total time per ring. 6 hr 45 min
Примечание. — «Непредвиденные задержки», включенные в эту таблицу, не охватывают периоды, в течение которых работы полностью или частично останавливались из-за проведения экспериментов и наблюдений, нехватки чугуна в связи с изменением проекта и праздников.
K — Включая время работы домкратов. L — Включая время, затраченное всей бригадой на установку болтов; в дополнение к этому работала небольшая бригада, которая тратила на эту работу все свое время. M — Главным образом из-за поломок гидравлических линий и эректора.
Давление воздуха. — Давление воздуха колеблелось от 17 до 37 фунтов. За русловой линией оно составляло в среднем 17 фунтов, а под рекой — 26 фунтов. За русловыми линиями давление обычно поддерживалось примерно равным напору воды на уровне шелыги, за исключением тех случаев в Уихокене, где, как описывалось ранее, это было невозможно.
В иле давление было значительно ниже гидростатического напора на уровне шелыги, но если возникала необходимость выполнять выемку грунта впереди щита, например на стыке щитов, требуемое давление воздуха было примерно равно весу вышележащего материала, а именно воды и ила, поскольку ил, имевший объемный вес от 97 до 106 фунтов на куб. фут и в среднем 100 фунтов на куб. фут, вел себя подобно жидкости.
ТАБЛИЦА 29. — Ежемесячный прогресс работ по щитовой проходке тоннеля.
Month North Manhattan. South Manhattan. North Weehawken. South Weehawken. Average progress per shield lin. ft. per month.
Number of rings erected. Station of leading ring. Lin. ft. for month. Number of rings erected. Station of leading ring. Lin. ft. for month. Number of rings erected. Station of leading ring. Lin. ft. for month. Number of rings erected. Station of leading ring. Lin. ft. for month.
For month. To date. For month. To date. For month. To date. For month. To date.
1905
May 26 26 200 + 83.7 63.7
15.9
June 26 52 201 + 49.0 65.3
24 24 260 + 76.6 59.3 12 12 260 + 70.0 30.0 38.6
July 28 80 202 + 19.2 70.2
12 36 260 + 46.6 30.0 15 27 260 + 32.4 37.6 34.4
Aug 26 106 202 + 84.3 65.1
15 51 260 + 09.1 37.5 16 43 260 + 07.4 25.0 31.9
Sept 21 127 203 + 36.8 52.5 31 31 200 + 96.4 76.4 1 52 260 + 06.6 2.5 18 61 259 + 47.2 60.2 47.9
Oct 25 152 203 + 99.4 63.6 45 76 202 + 09.2 112.8 10 62 259 + 81.5 25.1 20 81 258 + 97.2 50.0 62.9
Nov 31 183 204 + 76.9 77.5 31 107 202 + 86.5 77.3 29 91 259 + 09.0 72.5 39 120 257 + 99.7 97.5 81.2
Dec 59 242 206 + 24.6 147.7 34 141 208 + 71.8 85.3 46 137 257 + 94.0 115.0 77 197 256 + 07.1 192.6 135.1
1906
Jan 94 336 208 + 59.8 235.2 27 168 304 + 39.4 67.6 77 214 256 + 01.4 192.6 73 270 254 + 24.6 182.5 169.4
Feb 78 414 210 + 54.9 195.1 64 232 205 + 99.6 160.2 133 347 252 + 68.6 332.8 165 435 250 + 11.7 412.9 275.2
Mar 56 470 211 + 95.2 140.3 96 328 208 + 39.9 240.3 142 489 249 + 13.3 355.3 111 546 247 + 34.0 277.7 253.4
April 119 589 214 + 93.0 297.8 84 412 210 + 59.1 210.2 32 521 248 + 33.3 80.0 78 624 245 + 38.9 195.1 195.7
May 129 718 218 + 15.7 322.7 70 482 212 + 25.3 165.2 121 642 245 + 30.6 302.7 2 626 245 + 33.9 5.0 198.9
June 218 936 232 + 60.9 545.2 140 622 215 + 75.5 350.2 162 804 241 + 25.3 405.3 157 788 241 + 41.1 392.8 423.4
July 155 1,091 227 + 48.5 387.6 82 704 217 + 80.7 205.2 113 917 238 + 42.4 282.9 118 901 238 + 45.9 295.2 292.7
Aug 145 1,236 231 + 11.2 362.7 134 838 221 + 15.8 335.1 138 1,055 234 + 97.1 345.3 140 1,041 234 + 95.8 850.1 348.3
Sept 89 1,325 233 + 34.1 222.9 168 1,006 225 + 35.8 420.0 55 1,110 233 + 59.5 137.6 177 1,218 230 + 52.8 443.0 305.9
Oct
105 1,111 227 + 98.6 262.8 1 1,111 233 + 57.0 2.5 94 1,312 228 + 16.8 236.0 125.3
Nov
7 1,118 228 + 16.8 18.2 9 1,120 233 + 34.1 22.9
10.3
Воздуховод диаметром ½ дюйма был проведен напрямую из рабочей камеры к регистрирующим манометрам в машинном отделении, что позволяло персоналу машинного отделения постоянно следить за воздушной обстановкой внизу. Во избежание чрезмерного повышения давления на воздуховоде у каждого шлюза был установлен предохранительный ключ, настроенный на стравливание воздуха, если его давление поднималось выше желаемого. Компрессорная станция была вполне достаточной мощности, за исключением случаев прохождения гравийного участка в Уихокене, о чем говорилось ранее.
Велся учет подачи воздуха, и здесь можно сказать, что количество свободного воздуха на человека в час в целом составляло от 1500 до 5000 куб. футов, хотя в открытом гравие, где утечка была великой, оно некоторое время достигало 10 000 куб. футов. Более половины периода проходки в иле оно поддерживалось в пределах от 3000 до 4000 куб. футов, но когда стало очевидно, что любое количество воздуха свыше 2000 куб. футов не оказывает благотворного влияния на здоровье, попыток подавать больше не предпринималось, и в течение двух отдельных периодов по две недели подряд оно падало до 1000 куб. футов без какого-либо увеличения числа случаев кессонной болезни.
Количество CO2 в воздухе также измерялось ежедневно, так как спецификации требовали содержать не более 1 части CO2 на 1000 частей воздуха. Среднее значение колебалось в пределах от 0,8 до 1,5 частей на 1000, хотя в исключительных случаях оно падало до 0,3 и поднималось до 4,0. Температура воздуха в тоннелях обычно составляла от 55° до 60° по Фаренгейту, что соответствовало температуре окружающего ила, хотя временами на начальных этапах работ при масштабной цементации на длинных участках тоннеля в скальном грунте она колебалась от 85° до 110° по Фаренгейту.
Цементация. — Раствор состава по объему одна часть портландцемента на одну часть песка нагнетался за обделку тоннеля под давлением воздуха через резьбовые инъекционные отверстия диаметром 1½ дюйма с пробками, выполненные в каждом сегменте для этой цели везде, где грунт не должен был обрушиться на металлическую обделку сразу после ее монтажа. Иными словами, он применялся повсеместно до русловой линии; между русловыми линиями он не применялся, за исключением нью-йоркской подпорной стенки для заполнения пустот в каменной наброске и в точке стыка щитов, где производилась цементация пространства между металлической обделкой и обшивкой щитов снаружи нее. Использовался песок из Кау-Бей, который просеивался для удаления частиц размером более 1/10 дюйма в диаметре, способных засорить клапаны. Для последующих работ по цементации, а именно в верхней части бетонной обделки внутри металлической обделки, использовался песок с Рокавей-Бич. Он очень мелкий и не требовал просеивания; он стоил дороже, но экономия на просеивании и отсутствие засорения клапанов и т. д. привели к экономии.
Раствор смешивался в машине, показанной на рис. 2, пластинка XLI, представляющем собой общий вид процесса цементации.
Инъекционные трубы ввинчивались не напрямую в резьбовое отверстие в сегментах, а в инъекционное отверстие ввинчивалась труба, содержащая ниппель и запорный вентиль, к которой уже присоединялась инъекционная труба. Это предотвращало потери раствора, позволяло перекрыть вентиль, отсоединить инъекционную трубу и оставить патрубок на месте до схватывания раствора. На участке сплошного скального грунта монтировалось 20 или 30 колец без цементации; затем щит останавливался, последние два или три кольца отсоединялись и подтягивались щитом вперед, вокруг последнего оставленного кольца возводилась каменная упорная стенка, и все 20 или 30 колец цементировались за один раз. В иле и гравие в пределах береговой зоны каждое кольцо приходилось цементировать сразу после того, как щит проходил его, во избежание деформации сплющивания, вызываемой давлением на шелыгу в то время, когда борта еще не имели поддержки. Раствор удерживался от попадания в хвост щита путем заделки пространства пустыми мешками из-под цемента при содействии сегментных досок, прижимаемых к забою передового кольца U-образными хомутами, которые надевались на передний кольцевой фланец кольца и доски и затягивались клиньями. Давление воздуха составляло от 70 до 100 фунтов на кв. дюйм выше нормы.
Бригада состояла из одного слесаря-трубопроводника и одного или двух подсобных рабочих, занятых неполный рабочий день. Когда цементировался значительный участок за один раз, как на участке сплошного скального грунта, на короткое время привлекалось много рабочих.